My life & career
AI services depend on physical grids; technology choices and electricity availability now interact.
Better AI relies on real physical infrastructure: chips, buildings, cooling systems and reliable power. That's easy to forget when intelligence arrives through a small screen.
Energy forecasts are scenarios, not promises. Grid connections and equipment take years to build.
Big change is fascinating. Its implications are what matter.
AI services depend on physical grids; technology choices and electricity availability now interact.
Evaluate the full resource cost of AI infrastructure, including power, cooling and connection delays.
Utilities, data-center operators and industrial customers face a new balance between digital demand and physical build times.
In his 2026 energy keynote, Jim described AI as both the load and the solution—and the grid as a distributed, increasingly software-defined system.
Meet the futurist behind YottaBit ↗Add a speed-to-power question to your next digital infrastructure discussion.
For those who want the deeper explanation, the research is always available. The fascinating possibilities are only the beginning.
Models can improve within months. Major power-generation, transmission, interconnection and substation projects can take years. The IEA estimates data centers used about 415 TWh in 2024; a later report edition estimates about 485 TWh in 2025 and projects approximately 950 TWh in 2030. Those report vintages and projection assumptions must be preserved rather than spliced into a false observed series.
AI increases demand for computing infrastructure, but forecasting, optimization and control could also help grids manage complexity, improve planning and coordinate distributed energy resources. The net effect depends on reliability, implementation costs, policy, local constraints and additional demand triggered by cheaper computation.
Energy, cooling, equipment availability and grid access determine where and when infrastructure can be built. A compelling AI forecast that ignores these constraints is an incomplete forecast of the Yottabit Era.